Interior


[09-15-2005]
Painted dash and started installing new gauges.

[09-22-2005]
Carpet install...

[09-23-2005]
Cleaned up the back seat and put it in (along with the seat belts). I also painted and installed these sheet metal pieces on the rocker panels.

[09-29-2005]
Cleaned all metal (rails) on bottom of seats and painted them black. Started installing the automatic gear shift. Still need to finish the wiring. Installed the 3-point retractable seatbelts from Morris Classic Concepts. And bolted the front seats in.